Walton High School

A design and build project consisting of a new three storey sixth form teaching block. Constructed using modern methods of construction in the form of engineered, laminated timber walls and floor panels and heated through a ground source heat pump. CHP were appointed for the working drawing stage. The project was the first Eco scheme we worked on and was complex as the structural timber elements were also the insulation and the internal finish. The project value was £2.2M and completed in 2008.